Affiliations 

  • 1 Advanced Medical and Dental Institute (AMDI), Universiti Sains Malaysia
  • 2 Hospital Pulau Pinang
MyJurnal

Abstract

Introduction: Laboratory turnaround time (LTAT) is considered a reliable indicator of the quality and efficiency of a laboratory’s service. LTAT achievement, particularly of urgent tests, remains unsatisfactory and challenging in many clinical laboratories especially in tertiary health care centres with high workload and restricted resources. The unresolved issue of unsatisfactory urgent renal profile (RP) LTAT below the standard performance goal prompted our interest to improve laboratory’s handling of urgent test request. We thus implemented the Lean principle in the management of urgent test requests using urgent RP as the test model. Methods: The implementation of laboratory Lean involved 4 steps process; (1) Development of burning platform for change (2) Identification of waste (3) Plan- ning and implementation of control measures (4) Measuring, monitoring, and sustaining the improvement. Urgent RP LTAT and the percentage of the request met the time requirement determined based on the data extracted from laboratory information system (LIS) before and after the implementation of Lean was compared to assess the effec- tiveness. Results: Urgent RP LTAT after the implementation of Lean was reduced i.e 35 min (before) vs 31 min (after), with the percentage of LTAT met the time requirement was significantly increased above the set target i.e 82.8% (before) to 93.5% (after) with P-value = 0.001. Conclusion: Implementation of innovation using Lean management has significantly improved urgent RP LTAT achievement, thus optimised urgent test management in our Chemical Pathology laboratory. Lean is a strongly recommended strategy to improve urgent test LTAT especially in laboratories with restricted resources.