A preliminary study has been conducted in a new constructed 8 stories building (2 level of Hostels facility, 3 level of Training Room, 2 Level of Offices and 1 level of Exhibition Halls and Rooms) in Bandar Baru Bangi, Selangor. The Hostels facility is a floor tile and furnished with build in locker and use split air conditioning system while the Training Room and Exhibition Rooms used floor tile. The Offices and Exhibition Hall are carpeted furnished. All these spaces were using centralized air conditioning systems. A pre-commissioning assessment on 5 chemical parameters of indoor air pollutants such Total Volatile Organic Compounds (TVOC), Formaldehyde, Respirable Particulates (PM!